Class of 1945 Library Elevator Installation

Tuesday, September 15, 2009


Library Elevator Shaft

Project Team
Architect:  Lerch Bates Inc.
Contractor:  Otis Elevator
PEA Project Manager: Jim Landry
PEA Design Manager: Mark Leighton

 

Project Scope:
The original design of the building included elevator shafts for two elevators, however, only one elevator was installed.  This project includes the installation of a new passenger elevator in the existing elevator shaft along with the modernization of the current passenger elevator.

Project Schedule/Status:
Construction started in December 2008 with the replacement of the controller and motor for the current elevator.  The project was completed in June 2009.